Bathroom refit: what happens, in what order
A bathroom refit usually follows the same sequence. Knowing it helps you understand the timetable and why some days look quieter than others.
- Strip-out: old suite, tiles and sometimes plaster are removed.
- First fix: new pipes, waste and cables are run before walls are closed up.
- Boards and plaster: walls are made flat and ready for tiling.
- Waterproofing: wet areas are tanked. This step is easy to skip and expensive to get wrong.
- Tiling: walls and floor.
- Second fix: toilet, basin, bath or shower, taps, fan and lights.
- Finishing: silicone, decoration and a final check for leaks.
Electrical work in bathrooms is often notifiable. See GOV.UK on competent person schemes.